Roll roofing is a lightweight roofing material that s sold in a large roll.
Rolled roofing installation instructions.
Snap a chalk line as a guide for the first layer roofing.
2 like any other roof project you should start this one by addressing the valleys.
Roll roofing is a good choice for covering an existing roof.
Install roll roofing measure 35 inches up from the eaves at several intervals along the roof and mark them.
Cut the sections of flashing with tin snips as needed and nail.
Do not use the eaves as a guide instead because they can be uneven.
Spread the roofing cement along the.
Mark a chalk line to identify the end of your first layer.
Plan so that no two butt joints are closer than 2 feet from each other.
Install peel and stick roofing in a similar manner.
Apply asphalt plastic cement evenly over the entire area between chalk lines from one side of the joint to the other.
Cut the rolled roofing.
It not only protects the roof but it also protects the fascia.
3 take a roll of 18 inch wide roofing and use it to cover the length of the valley.
To seal a plumbing vent spread roofing.
The roll roofing should be clean and dry when it s installed.
This aluminum flashing protects the edges of the roof sheathing from water.
10 easy steps for diy rolled roofing installation 1 spend some time cleaning the roof before beginning a rolled roofing installation project.
Do not install roll.
Using a measuring tape measure 35 inches 89 cm up from.
It has a life expectancy of anywhere from six to 10 years but it s fairly inexpensive.
Install a drip edge around the perimeter of the roof.
To guide the installation snap a chalk line 5 from and parallel to the joint on both sides.
Typical roll roofing installation steps specifications roof slope.
Apply roofing cement to the roof.
It can be installed simply and requires only nails and roofing cement.
That means 2 inches of rise in 12 inches of horizontal run or steeper.
Installing the rolled roofing 1.
Drip edge or drip cap is either plastic or sheet metal.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
Install roll roofing when the temperature is at least 50 degrees fahrenheit to keep the material from cracking.
Don t install roll roofing whose.
Attach it to the valley with roofing nails spaced 6 inches apart about 3 4 inch from the edge.