For most load bearing requirements a roof truss will need to be placed every two feet along the walls.
Roof framing checklist.
Roof framing inspection checklist 1.
1 roof constructed in accordance with approved layout.
Truss roof framing as per design.
Daily safety inspection report sample is an audit report which is obviously crucial for any company to track the health and well being of the employees.
Determine if studs are toe nailed to sole plates with at least 3 8d or 2 16d nails.
Depending on how wide the home is you can divide the total length in feet by two to determine how many trusses will be needed.
Toe nail rim board to sill plate at 6 on center.
Approved documents which show.
R802 3 the rafters are framed opposite each other at the ridges.
Determine if continuous headers are toe nailed to studs with 4 8d nails.
For all new construction.
Wall framing inspection checklist continued m.
In high wind areas sheathing along the eaves rakes and ridges is nailed every 6 in.
Permit residential framing checklist approved city stamped plans roof specifications and engineered floor system information is on site and accessible to inspector.
Roof sheathing is nailed every 6 in.
R802 3 notches on the ends of rafters don t exceed the nominal joist depth.
2 bracing section 8 3 coupled roof connections ceiling joists to rafters collar ties to rafters 7 1 2 2 4 tie downs section 9 5 transfer of wall frame bracing 8 3 6 9 6 point loads including beams struts are adequately supported.
Add studs under all double girder truss double joist.
Determine if double studs are face nailed with 10d nails at 24 in.
The fields in the template include equipment standards of workers.
Determine how many rafters you ll need for the roof.
Roof the ridges hips and valleys have shall be designed as beams for roof slopes 3 ft.
The american plywood association says there s no reduction in strength for nails overdriven by 1 16in.
Layout plans truss members connection schedule permanent bracing details dormers roof structures on manufacturer s drawings equipment appliances on man ufacturer s drawings location as per layout alignment bearing spacing connections to bearing points.
Get fix for any cut damaged joist or truss from joist or truss company.
Job address is posted in a visible location per irc section r319 1.
Inspect rafter materials and allowable spans r 802 1 r 802 5 tables r 802 5 1 1 r 802 5 1 8 a.
Locate the grade mark on the rafter to determine species and grade.