For exposed fasteners avoid over tightening the fastener.
Roof panel installation.
Tesla solar roof cost a tesla solar roof costs 22 to 45 per square foot which includes the solar roof tiles a powerwall roof and site repairs and complete system installation.
This guide must by read and understood in its entirety before beginning installation.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
The installation of metal roof systems is a dangerous procedure and should be supervised by trained knowledgeable erectors.
Adjust door construction to desired size.
Pre drill holes on the ridges.
Cut the panels to the desired length.
Remove the old roof.
At this point chalk a line from ridge to eave.
Place the first screw.
Most panels come up to 32 feet 9 8 m in length.
Use your neoprene washer head screws to secure the metal to the sheathing.
Allow for a minimum of 18.
Place the leading edge of the first panel along this line.
This guide is supplied by fabral inc.
Apply front and back panels similarly to side walls.
For use by its customers.
Install vent as close to roof peak as possible.
Some panels have pre drilled holes.
5v crimp roofing must be applied on a minimum roof pitch of 2 12 or greater.
This is intended to be a guide only and does not.
Space the screws about 12 in 30 cm apart.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Cut to fit pitch of roof and around vent.
Pbr panel safety study applicable osha and other safety requirements before following these instructions.
You will need to order enough metal material to cover the entire roof and this process.
Installing corrugated roofing 1.
Use extreme care while installing roof panels.
Make sure that the screws are all aligned evenly as you will be able to see them from the ground if they are.
A 9 45 kw solar system installed on a 1 800 square foot roof costs between 39 600 and 81 000.
Measure one panel width in from the roof edge.
5v crimp installation guidelines caution.
Panel installation should begin at the gable end of the roof opposite the prevailing rain bearing wind this will provide added assurance against wind driven rain being forced under the laps.
You ll want to order metal panels that are an appropriate color and look to complement your.
Measure the roof area.
Overlap roof panels one corrugation away from prevailing wind and nail to rafters starting from one end.